Posts

Showing posts from February, 2024

Arroyo Ranch February 2024 Update

Image
  It has been a while since I have uploaded a video. We had to wait for winter and rainy weather to pass in order to get on the land. Gary and friends had been up there several times since I was able to go. They dropped off lots of tools, materials, furniture, heaters, and other items. They were able to add the heaters in, find temporary places for our compost toilets, add a compost area, add insulation, and work on the bathroom. It looks like a mess right now, but everything will be put in its place soon. We plan to be living up there fulltime by July, but we have lots to do to get us there. Next time Gary and the guys go up, we will have a 40 ft shipping container delivered, vaper barrier the walls, add paneling to the walls, install solar panels and electricity, add a rainwater catchment system, more water tanks, add the kitchen in, finish the bathhouse, and add a perimeter fence with electric wires to keep predators from getting in the property. There are lots to do, but I am confi